Show the team your current textured models.
Let's review the status of our assembled scene and check how the referencing and versioning is going.
In class create turntables for your models.
Production Team
Friday, October 12, 2012
Thursday, July 19, 2012
Project Due Date and Breakdown example
Projects have internal due date of Friday November the 2th 3pm.
Example of a 3D breakdown:
http://youtu.be/0sVNbFJGo8w
Example of a 3D breakdown:
http://youtu.be/0sVNbFJGo8w
Friday, July 13, 2012
Due Class #2:
Due Class #2:
- set drawings
- storyboards (not yet)
char concepts- Gantt chart for the 4 weeks (google doc)
- assign tasks by name (sign off who completed by color code)
- define what your breakdown will look like (not yet)
Class #1
In class:
Meet with instructor individually for your position on your team
Let's discuss the 3D production process using a white board, there will be a quiz.
2.) Brand open for Brightstone a non-profit that serves the adult disabled
Notes: Record studio quality voice over of "BrightStone is life empowering, life changing, and life saving."
3.) Digital Set
Length: 15-20sec + breakdown
4.) 3D Char Anim (use existing chars pre-rigged)
6.) Rigging
Meet with instructor individually for your position on your team
Let's discuss the 3D production process using a white board, there will be a quiz.
Projects to Chose From:
1.) 3D Lighting and Compositing Project
Length: 2 still shots @ 12 sec each + breakdown (camera move only, no animation)
Shot01: action pose
Shot02: photoreal render in outdoor environment
Time to complete: 3 weeks
Team Size: 3-5
Concept:
2 hard surface vehicles in an action pose (i.e. cop car chasing getaway car)
2.) Brand open for Brightstone a non-profit that serves the adult disabled
Length: 1 shot ~ 15sec + breakdown (model building, environment for camera move on facility)
Time to complete: 3 weeks
Team Size: 3-5
Concept:
Camera move on facility with brand reveal over the top
Notes: Record studio quality voice over of "BrightStone is life empowering, life changing, and life saving."
3.) Digital Set
Length: 15-20sec + breakdown
Time to complete: 3 weeks
Team Size: 3-5
Concept:
Live action footage of 2 objects that are the same, like 2 buildings for instance. Via CG and match moving model, render and composite a digital version of a similar asset.
OR
film actor on green screen and comp them into a digital env.
Team Size: 3-5
Concept:
Live action footage of 2 objects that are the same, like 2 buildings for instance. Via CG and match moving model, render and composite a digital version of a similar asset.
OR
film actor on green screen and comp them into a digital env.
4.) 3D Char Anim (use existing chars pre-rigged)
Length: 30 sec + breakdown (simple style allowing time to complete in 3 weeks)
Time to complete: 3 weeks
Team Size: 3-5
Concept:
2 chars challenging each other to see who can lift the most weight or boxes/apples/whatever
5.) Modeling
Concept:
2 chars challenging each other to see who can lift the most weight or boxes/apples/whatever
5.) Modeling
Length: 20-30 sec + breakdown (camera moves on stills)
Time to complete: 3 weeks
Team Size: 3-5
Concept:
Model a 3D environment of your choosing light and texture, animate cams, render comp.
Concept:
Model a 3D environment of your choosing light and texture, animate cams, render comp.
6.) Rigging
Length: 30 sec of animation + breakdown (robot crab walking or some other )
Time to complete: 3 weeks
Team Size: 2-4
Concept: Rig object animate, show the methods used, tools create etc in break down.
Concept: Rig object animate, show the methods used, tools create etc in break down.